aboutsummaryrefslogtreecommitdiffhomepage
path: root/tools/gce_setup/cloud_prod_runner.sh
Commit message (Expand)AuthorAge
* removing unnecessary tests.Gravatar Donna Dionne2015-07-29
* Adding new interop testsGravatar Donna Dionne2015-07-27
* Adding csharp_dotnet into cloud suite of testsGravatar Donna Dionne2015-06-01
* Modifying test result and log storage for better keeping of test history.Gravatar Donna Dionne2015-05-13
* more division of logs to make it easier to analyze test results.Gravatar Donna Dionne2015-05-06
* Ensuring test logs are not over written between runs.Gravatar Donna Dionne2015-05-06
* adding php to cloud to prod tests.Gravatar Donna Dionne2015-05-01
* Adding python to cloud prod tests.Gravatar Donna Dionne2015-04-14
* Adding links to individual test logs in test result page.Gravatar Donna Dionne2015-04-14
* Add jwt_token_creds test case to interop test for c++Gravatar Yang Gao2015-03-18
* Added timeout for tests that hangGravatar Donna Dionne2015-03-06
* Adding csharp to test suiteGravatar Donna Dionne2015-03-05
* adding a build images script and remove some tests while investigating timeoutGravatar Donna Dionne2015-03-02
* Fixing go commandsGravatar Donna Dionne2015-02-24
* Adding auth test into suite to be run automaticallyGravatar Donna Dionne2015-02-24
* Merge pull request #540 from ctiller/copyrightGravatar Tim Emiola2015-02-18
|\
| * Add missing new-lines at end of fileGravatar Craig Tiller2015-02-18
* | Add back a missing testGravatar Donna Dionne2015-02-18
| * Update copyright to 2015Gravatar Craig Tiller2015-02-18
* | Adding new tests into docker runsGravatar Donna Dionne2015-02-17
| * Add shell script copyrightsGravatar Craig Tiller2015-02-16
|/
* Rewrote the timeout for test commandsGravatar Donna Dionne2015-02-04
* Adding commands to run cloud to prod testsGravatar Donna Dionne2015-01-26